Have you ever thought about remodeling a bathroom? A well-designed and updated bathroom can add value to your home while enhancing your day-to-day life. Yet the average homeowner is unfamiliar with the details of home remodeling. One of the most common questions homeowners ask is: How long does it take to remodel a bathroom? 

The answer depends on several factors, including the scope of the project, the availability of materials, and whether or not you’re working with a contractor. 

Let’s take a closer look at the stages of a bathroom remodel as well as a general timeline for each phase.

Planning and Design Phase (1-4 weeks)

Every bathroom remodel needs to start with planning and design. During this stage, you will need to do the following:

Determine the Scope of the Project

Will you be making minor updates or completely gutting the bathroom? The extent of the work will directly impact the timeline.

Set a Budget

Establishing a realistic budget will help guide your decisions throughout the project.

Hire a Contractor

Hiring a professional contractor can help ensure your project stays on schedule and meets all necessary building codes. If you choose to tackle the project yourself, be prepared for potential setbacks, delays, and unexpected expenses, as well as navigating permits and inspections.

Create a Design Plan and Select Materials

Work with your contractor or designer to create a plan that fits your vision and budget. Be sure to order all necessary materials ahead of time to avoid delays during construction. If you work with a contractor, they will handle ordering materials and ensuring the project runs smoothly.

Obtaining Permits and Ordering Materials (1-4 weeks)

Before construction can begin, you’ll need to secure any necessary permits from local authorities. This process can take anywhere from a few days to several weeks, depending on your location and the complexity of the project. Permitting typically requires estimated costs for the project, so you’ll need to be prepared to order all materials and fixtures, such as tiles, cabinetry, and plumbing fixtures.

Of all the possible answers to the question of how long does it take to remodel a bathroom, this area can be the most unpredictable. Working with a contractor makes permitting far easier for the homeowner. Contractors will handle the permitting process on your behalf and coordinate with sub-contractors as needed.

Demolition and Preparation (1-2 weeks)

Once permits are secured and materials are on hand, the demolition and preparation phase can begin. During this stage, your contractor will:

Remove Old Fixtures and Finishes

This includes tearing out old flooring, wall tiles, cabinetry, and plumbing fixtures.

Prepare the Space for Construction

The contractor may need to repair or replace damaged areas such as rotted subfloors or moldy drywall.

Ensure Proper Ventilation and Moisture Protection

They’ll install fans or vents if needed, and make sure your bathroom is adequately sealed against moisture damage.

Plumbing and Electrical Work (1-2 Weeks)

With the space prepared, it’s time to tackle the plumbing and electrical work. This stage involves:

  • Installing or relocating pipes and drains. If you’re changing the layout of your bathroom or adding new fixtures, you’ll need to adjust the plumbing accordingly.
  • Setting up electrical wiring for lighting and appliances. Your contractor should make sure your bathroom is up to code by installing GFCI outlets and ensuring proper wiring for lights, fans, and appliances.

During this phase, local authorities usually require inspections and approvals. 

Installation of New Fixtures and Finishes (1-3 Weeks)

With the plumbing and electrical work complete, the room is ready for fixtures and finishes such as:

  • Installing flooring, wall tiles, and cabinetry.
  • Installing new fixtures such as bathtub, shower, toilet, and sink.
  • Painting and adding finishing touches.

Clean-up and Finishing Touches (1-2 weeks)

As your bathroom remodel nears completion, ensure all work is completed and up to code. This often involves:

  • Final inspections and approvals.
  • Cleaning the space and preparing for use.

Once the space has been cleaned and approved, you’re ready to enjoy your newly remodeled bathroom.

How Long Does It Take to Remodel a Bathroom with Meridian?

We promised an answer to the question, “How long does it take to remodel a bathroom?” — and here it is: anywhere from 6-12 weeks, depending on the scope of the project. Keep in mind that factors such as permitting, material availability, and unforeseen issues (supply chain, weather, etc.) during construction can all impact the timeline.

When you work with Meridian DesignBuild, Ltd. for your bathroom renovation project, you can expect our team to cover every detail for you. From day one, we’ll work with you to create a design and establish a budget that works for you. 

We’re experts in home remodeling and renovations, including bathrooms and kitchens. Contact us today for a free consultation and discover how a brand-new bathroom can add value to your home immediately.